{"id":448,"date":"2025-05-31T07:48:31","date_gmt":"2025-05-31T07:48:31","guid":{"rendered":"https:\/\/nuclearenergy.gr\/?p=448"},"modified":"2025-05-31T08:08:49","modified_gmt":"2025-05-31T08:08:49","slug":"the-akkuyu-nuclear-power-plant","status":"publish","type":"post","link":"https:\/\/nuclearenergy.gr\/en\/the-akkuyu-nuclear-power-plant\/","title":{"rendered":"The Akkuyu nuclear power plant in Turkey"},"content":{"rendered":"<p>The Akkuyu Nuclear Power Plant is one of the most ambitious and controversial energy projects of modern times in the Eastern Mediterranean region. The plant, located in the Mersin province of southern Turkey, represents a strategic move for the energy independence of its neighbor, while at the same time raising significant concerns for the environmental safety of the wider region.<\/p>\n<h2>General Characteristics of the Project<\/h2>\n<p>The Akkuyu nuclear power plant is Turkey&#039;s first commercial nuclear power plant and one of the country&#039;s largest energy projects. With a total cost of $20 billion, the project is being implemented in partnership with the Russian company <a href=\"https:\/\/nuclearenergy.gr\/en\/rosatom-rosatom-the-russian-nuclear-company\/\">Rosatom<\/a>, which owns 51% of the project&#039;s shares.<\/p>\n<p>The plant will have four state-of-the-art reactors <a href=\"https:\/\/nuclearenergy.gr\/en\/nuclear-reactors-type-vver-1200\/\">VVER-1200<\/a> third generation, with a total capacity of 4,800 MW. The first unit is expected to be operational in 2025, while the remaining three units will be activated sequentially, one year apart, completing construction by 2028.<\/p>\n<h2>Strategic Importance for Turkey<\/h2>\n<p>Turkey, as a rapidly growing economy, faces increasing energy needs. According to estimates by the International Atomic Energy Agency (IAEA), the country imports approximately 72% of its energy needs. The Akkuyu plant is expected to meet approximately 10% of Turkey&#039;s electricity needs, significantly contributing to reducing the country&#039;s energy dependence.<\/p>\n<p>At the same time, the project is a key element of the strategic cooperation between Turkey and Russia in the energy sector. The Russian VVER-1200 technology is considered one of the most advanced nuclear power technologies in the world, offering high levels of safety and efficiency.<\/p>\n<h2>Environmental and Geological Concerns<\/h2>\n<p>Despite its technical advantages, the project has sparked strong reactions and concerns, particularly from neighboring countries and environmental organizations. The main concern is related to the fact that the Akkuyu area is located in a seismic zone, which increases the risks in the event of seismic activity.<\/p>\n<p>Neighboring countries, particularly Greece and Cyprus, have expressed strong concerns about the safety of the project. The European Parliament has issued several resolutions calling on Turkey to halt the plant construction plans and comply with the Espoo Convention on Environmental Impact Assessment in a Transboundary Context.<\/p>\n<h2>Technical Specifications and Safety<\/h2>\n<p>The VVER-1200 reactors to be installed at Akkuyu feature advanced safety systems, including passive safety systems that operate without external power supply. This technology is designed to withstand extreme conditions, including earthquakes and other natural disasters.<\/p>\n<p>More than 30,000 workers are working on the project day and night, while Turkey has achieved a 56% local content rate in construction, strengthening domestic industry and know-how. This is an important step towards developing domestic capabilities in the nuclear sector.<\/p>\n<h2>Economic Impact<\/h2>\n<p>The Akkuyu project is expected to have a significant positive impact on the Turkish economy. In addition to creating thousands of jobs during the construction phase, the plant will continue to employ a large number of skilled personnel during its operation.<\/p>\n<p>In addition, reducing dependence on energy imports will have long-term benefits for the country&#039;s trade balance. The plant will produce clean energy without carbon dioxide emissions, contributing to Turkey&#039;s environmental goals.<\/p>\n<h2>Diplomatic and Geopolitical Implications<\/h2>\n<p>The project has significant geopolitical dimensions, as it strengthens Turkish-Russian relations at a time when international relations are particularly complex. However, developments in Ukraine and international sanctions against Russia have raised additional concerns about the future operation and maintenance of the plant.<\/p>\n<p>Turkey has even considered forcibly taking control of the project if deemed necessary for national security reasons, demonstrating the strategic importance Ankara attaches to the project.<\/p>\n<h2>Future and Prospects<\/h2>\n<p>As the project nears completion, discussions around safety and environmental impacts continue. The international community is closely monitoring developments, while neighboring countries insist on the need for transparency and compliance with international safety standards.<\/p>\n<p>The Akkuyu nuclear power plant is a milestone for Turkey&#039;s energy strategy, but also a significant challenge for maintaining the environmental balance in the Eastern Mediterranean. Its successful operation will require continuous monitoring, transparency and cooperation with the international community to ensure the highest safety standards.<\/p>\n<h2 class=\"text-xl font-bold text-text-100 mt-1 -mb-0.5\">Official Sources:<\/h2>\n<ol class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-decimal space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\"><strong>Akkuyu Nuclear Official Website<\/strong>: <a class=\"underline\" href=\"https:\/\/akkuyu.com\/en\/about\/info\">https:\/\/akkuyu.com\/en\/about\/info<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>Akkuyu Nuclear \u2013 Facts<\/strong>: <a class=\"underline\" href=\"https:\/\/akkuyu.com\/en\/facts\">https:\/\/akkuyu.com\/en\/facts<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>Akkuyu Nuclear \u2013 How it works<\/strong>: <a class=\"underline\" href=\"https:\/\/akkuyu.com\/en\/how-it-works\">https:\/\/akkuyu.com\/en\/how-it-works<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>Turkish Nuclear Regulatory Authority<\/strong>: <a class=\"underline\" href=\"https:\/\/www.ndk.gov.tr\/en-US\/licensing-of-akkuyu-nuclear-power-plant\">https:\/\/www.ndk.gov.tr\/en-US\/licensing-of-akkuyu-nuclear-power-plant<\/a><\/li>\n<\/ol>\n<h2 class=\"text-xl font-bold text-text-100 mt-1 -mb-0.5\">International Organizations:<\/h2>\n<ol class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-decimal space-y-1.5 pl-7\" start=\"5\">\n<li class=\"whitespace-normal break-words\"><strong>IAEA \u2013 Turkey Starts Construction<\/strong>: <a class=\"underline\" href=\"https:\/\/www.iaea.org\/newscenter\/news\/turkey-starts-construction-of-its-first-nuclear-power-plant\">https:\/\/www.iaea.org\/newscenter\/news\/turkey-starts-construction-of-its-first-nuclear-power-plant<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>IAEA PRIS Database \u2013 Akkuyu-2<\/strong>: <a class=\"underline\" href=\"https:\/\/pris.iaea.org\/pris\/CountryStatistics\/ReactorDetails.aspx?current=1080\">https:\/\/pris.iaea.org\/pris\/CountryStatistics\/ReactorDetails.aspx?current=1080<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>World Nuclear Association \u2013 Nuclear Power in Turkey<\/strong>: <a class=\"underline\" href=\"https:\/\/world-nuclear.org\/information-library\/country-profiles\/countries-t-z\/turkey\">https:\/\/world-nuclear.org\/information-library\/country-profiles\/countries-t-z\/turkey<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>World Nuclear Association \u2013 Akkuyu 1<\/strong>: <a class=\"underline\" href=\"https:\/\/world-nuclear.org\/nuclear-reactor-database\/details\/akkuyu-1\">https:\/\/world-nuclear.org\/nuclear-reactor-database\/details\/akkuyu-1<\/a><\/li>\n<\/ol>\n<h2 class=\"text-xl font-bold text-text-100 mt-1 -mb-0.5\">News Sources:<\/h2>\n<ol class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-decimal space-y-1.5 pl-7\" start=\"9\">\n<li class=\"whitespace-normal break-words\"><strong>Wikipedia \u2013 Akkuyu Nuclear Power Plant<\/strong>: <a class=\"underline\" href=\"https:\/\/en.wikipedia.org\/wiki\/Akkuyu_Nuclear_Power_Plant\">https:\/\/en.wikipedia.org\/wiki\/Akkuyu_Nuclear_Power_Plant<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>Wikipedia \u2013 Nuclear power in Turkey<\/strong>: <a class=\"underline\" href=\"https:\/\/en.wikipedia.org\/wiki\/Nuclear_power_in_Turkey\">https:\/\/en.wikipedia.org\/wiki\/Nuclear_power_in_Turkey<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>World Nuclear News \u2013 Turkey and Russia nuclear projects<\/strong>: <a class=\"underline\" href=\"https:\/\/www.world-nuclear-news.org\/Articles\/Turkey-and-Russia-discuss-state-of-nuclear-project\">https:\/\/www.world-nuclear-news.org\/Articles\/Turkey-and-Russia-discuss-state-of-nuclear-project<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>ANS Nuclear Newswire \u2013 Commissioning work started<\/strong>: <a class=\"underline\" href=\"https:\/\/www.ans.org\/news\/article-5935\/commissioning-work-started-atturkeys-first-nuclear-plant\/\">https:\/\/www.ans.org\/news\/article-5935\/commissioning-work-started-atturkeys-first-nuclear-plant\/<\/a><\/li>\n<\/ol>\n<h2 class=\"text-xl font-bold text-text-100 mt-1 -mb-0.5\">Analytical and Technical Sources:<\/h2>\n<ol class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-decimal space-y-1.5 pl-7\" start=\"13\">\n<li class=\"whitespace-normal break-words\"><strong>NucNet \u2013 Turkey Local Content Rates<\/strong>: <a class=\"underline\" href=\"https:\/\/www.nucnet.org\/news\/turkey-reaches-56-local-content-rates-at-akkuyu-nuclear-station-says-official-1-4-2025\">https:\/\/www.nucnet.org\/news\/turkey-reaches-56-local-content-rates-at-akkuyu-nuclear-station-says-official-1-4-2025<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>NucNet \u2013 Rosatom Construction Progress<\/strong>: <a class=\"underline\" href=\"https:\/\/www.nucnet.org\/news\/russia-s-rosatom-announces-construction-progress-at-akkuyu-2-4-3-2023\">https:\/\/www.nucnet.org\/news\/russia-s-rosatom-announces-construction-progress-at-akkuyu-2-4-3-2023<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>Dextra Group \u2013 Technical specifications<\/strong>: <a class=\"underline\" href=\"https:\/\/www.dextragroup.com\/akkuyu-nuclear-power-plant\/\">https:\/\/www.dextragroup.com\/akkuyu-nuclear-power-plant\/<\/a><\/li>\n<li class=\"whitespace-normal break-words\"><strong>TSO Turkey \u2013 VVER 1200 Reactor details<\/strong>: <a class=\"underline\" href=\"https:\/\/tsoturkey.com\/page_fields_library_vver1200.html\">https:\/\/tsoturkey.com\/page_fields_library_vver1200.html<\/a><\/li>\n<\/ol>","protected":false},"excerpt":{"rendered":"<p>The Akkuyu Nuclear Power Plant is one of the most ambitious and controversial<\/p>","protected":false},"author":1,"featured_media":449,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[944,964,1002,874,1003,13,506],"class_list":["post-448","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-akkuyu","tag-rosatom","tag-vver-1200","tag-874","tag-1003","tag-13","tag-506"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.9 (Yoast SEO v23.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>\u03a4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03bf\u03c5 \u0391\u03ba\u03bf\u03cd\u03b3\u03b9\u03bf\u03c5 (Akkuyu) \u03c4\u03b7\u03c2 \u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\u03c2 - \u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1<\/title>\n<meta name=\"description\" content=\"\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03ac\u03c1\u03b8\u03c1\u03bf \u03b3\u03b9\u03b1 \u03c4o \u03c0\u03c1\u03ce\u03c4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03b7\u03c2 \u03c7\u03ce\u03c1\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03c0\u03b5\u03c1\u03b9\u03b2\u03b1\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03bd\u03b7\u03c3\u03c5\u03c7\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b3\u03b5\u03c9\u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c0\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03b7\u03bd \u0391\u03bd\u03b1\u03c4\u03bf\u03bb\u03b9\u03ba\u03ae \u039c\u03b5\u03c3\u03cc\u03b3\u03b5\u03b9\u03bf\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nuclearenergy.gr\/en\/the-akkuyu-nuclear-power-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u03a4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03bf\u03c5 \u0391\u03ba\u03bf\u03cd\u03b3\u03b9\u03bf\u03c5 (Akkuyu) \u03c4\u03b7\u03c2 \u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\u03c2\" \/>\n<meta property=\"og:description\" content=\"\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03ac\u03c1\u03b8\u03c1\u03bf \u03b3\u03b9\u03b1 \u03c4o \u03c0\u03c1\u03ce\u03c4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03b7\u03c2 \u03c7\u03ce\u03c1\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03c0\u03b5\u03c1\u03b9\u03b2\u03b1\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03bd\u03b7\u03c3\u03c5\u03c7\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b3\u03b5\u03c9\u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c0\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03b7\u03bd \u0391\u03bd\u03b1\u03c4\u03bf\u03bb\u03b9\u03ba\u03ae \u039c\u03b5\u03c3\u03cc\u03b3\u03b5\u03b9\u03bf\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nuclearenergy.gr\/en\/the-akkuyu-nuclear-power-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\" \/>\n<meta property=\"article:author\" content=\"\u039d\u03b1\u03c0\u03bf\u03bb\u03ad\u03c9\u03bd \u0396\u03ad\u03c1\u03b2\u03b1 05\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-31T07:48:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-31T08:08:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"780\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"NuclearEnergy\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"NuclearEnergy\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/\"},\"author\":{\"name\":\"NuclearEnergy\",\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/person\/ce18c9039df00f114dbaa6f1ac510d79\"},\"headline\":\"\u03a4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03bf\u03c5 \u0391\u03ba\u03bf\u03cd\u03b3\u03b9\u03bf\u03c5 (Akkuyu) \u03c4\u03b7\u03c2 \u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\u03c2\",\"datePublished\":\"2025-05-31T07:48:31+00:00\",\"dateModified\":\"2025-05-31T08:08:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/\"},\"wordCount\":222,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/nuclearenergy.gr\/#organization\"},\"image\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg\",\"keywords\":[\"Akkuyu\",\"Rosatom\",\"VVER-1200\",\"\u03b3\u03b5\u03c9\u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae\",\"\u03c0\u03b5\u03c1\u03b9\u03b2\u03b1\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ae \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1\",\"\u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"\u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/\",\"url\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/\",\"name\":\"\u03a4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03bf\u03c5 \u0391\u03ba\u03bf\u03cd\u03b3\u03b9\u03bf\u03c5 (Akkuyu) \u03c4\u03b7\u03c2 \u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\u03c2 - \u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"isPartOf\":{\"@id\":\"https:\/\/nuclearenergy.gr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg\",\"datePublished\":\"2025-05-31T07:48:31+00:00\",\"dateModified\":\"2025-05-31T08:08:49+00:00\",\"description\":\"\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03ac\u03c1\u03b8\u03c1\u03bf \u03b3\u03b9\u03b1 \u03c4o \u03c0\u03c1\u03ce\u03c4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03b7\u03c2 \u03c7\u03ce\u03c1\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03c0\u03b5\u03c1\u03b9\u03b2\u03b1\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03bd\u03b7\u03c3\u03c5\u03c7\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b3\u03b5\u03c9\u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c0\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03b7\u03bd \u0391\u03bd\u03b1\u03c4\u03bf\u03bb\u03b9\u03ba\u03ae \u039c\u03b5\u03c3\u03cc\u03b3\u03b5\u03b9\u03bf\",\"breadcrumb\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#primaryimage\",\"url\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg\",\"contentUrl\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg\",\"width\":1170,\"height\":780,\"caption\":\"\u03a0\u03b7\u03b3\u03ae \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1\u03c2 : https:\/\/akkuyu.com\/en\/about\/history\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae\",\"item\":\"https:\/\/nuclearenergy.gr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u03a4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03bf\u03c5 \u0391\u03ba\u03bf\u03cd\u03b3\u03b9\u03bf\u03c5 (Akkuyu) \u03c4\u03b7\u03c2 \u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\u03c2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nuclearenergy.gr\/#website\",\"url\":\"https:\/\/nuclearenergy.gr\/\",\"name\":\"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"description\":\"\u039c\u03b9\u03b1 \u03b9\u03c3\u03c4\u03bf\u03c3\u03b5\u03bb\u03af\u03b4\u03b1 \u03bc\u03b5 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2, \u03ac\u03c1\u03b8\u03c1\u03b1 \u03ba\u03b1\u03b9 \u03b3\u03c1\u03b1\u03c6\u03b9\u03ba\u03ad\u03c2 \u03b1\u03c0\u03b5\u03b9\u03ba\u03bf\u03bd\u03af\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03bc\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"publisher\":{\"@id\":\"https:\/\/nuclearenergy.gr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nuclearenergy.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/nuclearenergy.gr\/#organization\",\"name\":\"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"url\":\"https:\/\/nuclearenergy.gr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/11\/cropped-cropped-nuclear-energy-icon.jpg\",\"contentUrl\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/11\/cropped-cropped-nuclear-energy-icon.jpg\",\"width\":120,\"height\":120,\"caption\":\"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\"},\"image\":{\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/person\/ce18c9039df00f114dbaa6f1ac510d79\",\"name\":\"NuclearEnergy\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/722301d4730f0933fcc556a50f7dfde0fcbbf9f39858949664d541ba7e186d48?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/722301d4730f0933fcc556a50f7dfde0fcbbf9f39858949664d541ba7e186d48?s=96&d=mm&r=g\",\"caption\":\"NuclearEnergy\"},\"sameAs\":[\"http:\/\/nuclearenergy.gr\",\"\u039d\u03b1\u03c0\u03bf\u03bb\u03ad\u03c9\u03bd \u0396\u03ad\u03c1\u03b2\u03b1 05\"],\"url\":\"https:\/\/nuclearenergy.gr\/en\/author\/tommykargmail-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"The Akkuyu Nuclear Power Plant in Turkey - Nuclear Energy","description":"Detailed article on the country&#039;s first nuclear power plant, environmental concerns and geopolitical implications in the Eastern Mediterranean","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nuclearenergy.gr\/en\/the-akkuyu-nuclear-power-plant\/","og_locale":"en_US","og_type":"article","og_title":"\u03a4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03bf\u03c5 \u0391\u03ba\u03bf\u03cd\u03b3\u03b9\u03bf\u03c5 (Akkuyu) \u03c4\u03b7\u03c2 \u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\u03c2","og_description":"\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03cc \u03ac\u03c1\u03b8\u03c1\u03bf \u03b3\u03b9\u03b1 \u03c4o \u03c0\u03c1\u03ce\u03c4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03b7\u03c2 \u03c7\u03ce\u03c1\u03b1\u03c2, \u03c4\u03b9\u03c2 \u03c0\u03b5\u03c1\u03b9\u03b2\u03b1\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b1\u03bd\u03b7\u03c3\u03c5\u03c7\u03af\u03b5\u03c2 \u03ba\u03b1\u03b9 \u03c4\u03b9\u03c2 \u03b3\u03b5\u03c9\u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ad\u03c2 \u03b5\u03c0\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c4\u03b7\u03bd \u0391\u03bd\u03b1\u03c4\u03bf\u03bb\u03b9\u03ba\u03ae \u039c\u03b5\u03c3\u03cc\u03b3\u03b5\u03b9\u03bf","og_url":"https:\/\/nuclearenergy.gr\/en\/the-akkuyu-nuclear-power-plant\/","og_site_name":"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1","article_author":"\u039d\u03b1\u03c0\u03bf\u03bb\u03ad\u03c9\u03bd \u0396\u03ad\u03c1\u03b2\u03b1 05","article_published_time":"2025-05-31T07:48:31+00:00","article_modified_time":"2025-05-31T08:08:49+00:00","og_image":[{"width":1170,"height":780,"url":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg","type":"image\/jpeg"}],"author":"NuclearEnergy","twitter_card":"summary_large_image","twitter_misc":{"Written by":"NuclearEnergy","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#article","isPartOf":{"@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/"},"author":{"name":"NuclearEnergy","@id":"https:\/\/nuclearenergy.gr\/#\/schema\/person\/ce18c9039df00f114dbaa6f1ac510d79"},"headline":"\u03a4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03bf\u03c5 \u0391\u03ba\u03bf\u03cd\u03b3\u03b9\u03bf\u03c5 (Akkuyu) \u03c4\u03b7\u03c2 \u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\u03c2","datePublished":"2025-05-31T07:48:31+00:00","dateModified":"2025-05-31T08:08:49+00:00","mainEntityOfPage":{"@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/"},"wordCount":222,"commentCount":0,"publisher":{"@id":"https:\/\/nuclearenergy.gr\/#organization"},"image":{"@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#primaryimage"},"thumbnailUrl":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg","keywords":["Akkuyu","Rosatom","VVER-1200","\u03b3\u03b5\u03c9\u03c0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03ae","\u03c0\u03b5\u03c1\u03b9\u03b2\u03b1\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ae \u03b1\u03c3\u03c6\u03ac\u03bb\u03b5\u03b9\u03b1","\u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1","\u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1"],"articleSection":["Blog"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/","url":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/","name":"The Akkuyu Nuclear Power Plant in Turkey - Nuclear Energy","isPartOf":{"@id":"https:\/\/nuclearenergy.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#primaryimage"},"image":{"@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#primaryimage"},"thumbnailUrl":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg","datePublished":"2025-05-31T07:48:31+00:00","dateModified":"2025-05-31T08:08:49+00:00","description":"Detailed article on the country&#039;s first nuclear power plant, environmental concerns and geopolitical implications in the Eastern Mediterranean","breadcrumb":{"@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#primaryimage","url":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg","contentUrl":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/6.jpg","width":1170,"height":780,"caption":"\u03a0\u03b7\u03b3\u03ae \u03b5\u03b9\u03ba\u03cc\u03bd\u03b1\u03c2 : https:\/\/akkuyu.com\/en\/about\/history"},{"@type":"BreadcrumbList","@id":"https:\/\/nuclearenergy.gr\/%cf%84%ce%bf-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf-%cf%84%ce%bf%cf%85-%ce%b1%ce%ba%ce%bf%cf%8d%ce%b3%ce%b9%ce%bf%cf%85-akkuyu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae","item":"https:\/\/nuclearenergy.gr\/"},{"@type":"ListItem","position":2,"name":"\u03a4\u03bf \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf \u03c4\u03bf\u03c5 \u0391\u03ba\u03bf\u03cd\u03b3\u03b9\u03bf\u03c5 (Akkuyu) \u03c4\u03b7\u03c2 \u03a4\u03bf\u03c5\u03c1\u03ba\u03af\u03b1\u03c2"}]},{"@type":"WebSite","@id":"https:\/\/nuclearenergy.gr\/#website","url":"https:\/\/nuclearenergy.gr\/","name":"Nuclear energy","description":"A website with information, articles and graphics about nuclear energy","publisher":{"@id":"https:\/\/nuclearenergy.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nuclearenergy.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/nuclearenergy.gr\/#organization","name":"Nuclear energy","url":"https:\/\/nuclearenergy.gr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nuclearenergy.gr\/#\/schema\/logo\/image\/","url":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/11\/cropped-cropped-nuclear-energy-icon.jpg","contentUrl":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/11\/cropped-cropped-nuclear-energy-icon.jpg","width":120,"height":120,"caption":"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1"},"image":{"@id":"https:\/\/nuclearenergy.gr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/nuclearenergy.gr\/#\/schema\/person\/ce18c9039df00f114dbaa6f1ac510d79","name":"Nuclear Energy","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nuclearenergy.gr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/722301d4730f0933fcc556a50f7dfde0fcbbf9f39858949664d541ba7e186d48?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/722301d4730f0933fcc556a50f7dfde0fcbbf9f39858949664d541ba7e186d48?s=96&d=mm&r=g","caption":"NuclearEnergy"},"sameAs":["http:\/\/nuclearenergy.gr","\u039d\u03b1\u03c0\u03bf\u03bb\u03ad\u03c9\u03bd \u0396\u03ad\u03c1\u03b2\u03b1 05"],"url":"https:\/\/nuclearenergy.gr\/en\/author\/tommykargmail-com\/"}]}},"_links":{"self":[{"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/posts\/448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/comments?post=448"}],"version-history":[{"count":4,"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/posts\/448\/revisions"}],"predecessor-version":[{"id":460,"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/posts\/448\/revisions\/460"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/media\/449"}],"wp:attachment":[{"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/media?parent=448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/categories?post=448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearenergy.gr\/en\/wp-json\/wp\/v2\/tags?post=448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}