{"id":70,"date":"2025-05-13T12:40:19","date_gmt":"2025-05-13T12:40:19","guid":{"rendered":"https:\/\/nuclearenergy.gr\/?p=70"},"modified":"2025-05-13T12:46:16","modified_gmt":"2025-05-13T12:46:16","slug":"quanto-costa-una-centrale-nucleare","status":"publish","type":"post","link":"https:\/\/nuclearenergy.gr\/it\/quanto-costa-una-centrale-nucleare\/","title":{"rendered":"Quanto costa costruire e mantenere una centrale nucleare?"},"content":{"rendered":"<h2>Importare<\/h2>\n<p>Le centrali nucleari rappresentano una delle principali fonti di energia a livello mondiale, producendo circa 101 TP3T dell&#039;elettricit\u00e0 mondiale. Nonostante i vantaggi in termini di basse emissioni di carbonio e alta efficienza, i costi economici per la loro costruzione e manutenzione sono oggetto di un acceso dibattito. In questo articolo, analizzeremo pi\u00f9 da vicino i costi di costruzione e manutenzione di una centrale nucleare, nonch\u00e9 i fattori che li influenzano.<\/p>\n<h2>Il costo di costruzione di una centrale nucleare<\/h2>\n<h3>Costo del capitale iniziale<\/h3>\n<p>Il costo di costruzione di una centrale nucleare \u00e8 estremamente elevato e costituisce la parte pi\u00f9 consistente dell&#039;investimento totale. Secondo i dati pi\u00f9 recenti, il costo varia da <strong>da 6 a 9 miliardi di euro<\/strong> per impianti di medie dimensioni (1.000 MW) nei paesi sviluppati.<\/p>\n<p>Nello specifico, il costo di costruzione comprende:<\/p>\n<ol>\n<li><strong>Progettazione e studi<\/strong>: 5-10% del costo totale<\/li>\n<li><strong>Costruzione di strutture<\/strong>: 35-45% del costo totale<\/li>\n<li><strong>Acquisto e installazione di attrezzature<\/strong>: 30-40% del costo totale<\/li>\n<li><strong>Sistemi di sicurezza<\/strong>: 15-25% del costo totale<\/li>\n<\/ol>\n<h3>Fattori che influenzano i costi di costruzione<\/h3>\n<p>I costi di costruzione possono variare notevolmente a seconda di diversi fattori:<\/p>\n<h4>Posizione e paese<\/h4>\n<p>Nelle economie in via di sviluppo come Cina e India, i costi di produzione possono essere inferiori di 20-30 tonnellate rispetto agli Stati Uniti o all&#039;Europa, principalmente grazie al minor costo del lavoro. Tuttavia, nella maggior parte dei paesi europei, le normative di sicurezza pi\u00f9 severe hanno aumentato i costi di produzione di 15-20 tonnellate nell&#039;ultimo decennio.<\/p>\n<h4>Tipo di reattore<\/h4>\n<p>I diversi tipi di reattori hanno costi diversi:<\/p>\n<ul>\n<li><strong>Reattori ad acqua pressurizzata (PWR)<\/strong>: 5-8 miliardi di euro<\/li>\n<li><strong>Reattori ad acqua bollente avanzati (ABWR)<\/strong>: 6-9 miliardi di euro<\/li>\n<li><strong>Piccoli reattori modulari (SMR)<\/strong>: 1-3 miliardi di euro (per impianti da 300-400 MW)<\/li>\n<\/ul>\n<h4>Quadro normativo<\/h4>\n<p>Le norme di sicurezza pi\u00f9 severe in seguito agli incidenti di Chernobyl e Fukushima hanno aumentato significativamente i costi di costruzione. In particolare, le nuove norme di sicurezza hanno aggiunto circa 1,5-2 miliardi di euro al costo totale delle moderne centrali nucleari.<\/p>\n<h2>Il costo di manutenzione di una centrale nucleare<\/h2>\n<h3>Spese operative<\/h3>\n<p>I costi operativi annuali di una tipica centrale nucleare variano tra <strong>100 e 200 milioni di euro<\/strong>Tra questi:<\/p>\n<ol>\n<li><strong>Carburante<\/strong>: 15-25% di spese operative<\/li>\n<li><strong>Personale<\/strong>: 30-40% di spese operative<\/li>\n<li><strong>Manutenzione e riparazioni<\/strong>: 20-30% di spese operative<\/li>\n<li><strong>Costi assicurativi e normativi<\/strong>: 10-15% di spese operative<\/li>\n<li><strong>Trattamento dei rifiuti<\/strong>: 5-10% di spese operative<\/li>\n<\/ol>\n<h3>costi del carburante<\/h3>\n<p>L&#039;uranio, il combustibile principale nei reattori nucleari, ha un prezzo relativamente stabile rispetto ai combustibili fossili. Una tipica centrale nucleare da 1.000 MW richiede circa 20-25 tonnellate di uranio arricchito all&#039;anno, con un costo di circa 20-30 milioni di euro.<\/p>\n<p>Vale la pena notare che i costi del carburante rappresentano solo 15-251 TP3T dei costi operativi totali, a differenza degli impianti a combustibili fossili in cui i costi del carburante possono costituire fino a 801 TP3T dei costi operativi.<\/p>\n<h3>Costi del personale<\/h3>\n<p>Una tipica centrale nucleare impiega dai 400 ai 700 lavoratori a tempo pieno, con un costo annuo del personale di circa 40-60 milioni di euro. Il personale comprende ingegneri, tecnici, personale di sicurezza, personale amministrativo e scienziati specializzati.<\/p>\n<h3>Costi di gestione dei rifiuti<\/h3>\n<p>La gestione dei rifiuti radioattivi rappresenta una sfida significativa e comporta costi significativi. I costi annuali di gestione dei rifiuti variano dai 5 ai 15 milioni di euro, a seconda delle normative locali e delle strutture di stoccaggio disponibili.<\/p>\n<h2>Estensione della durata di vita e dismissione<\/h2>\n<h3>Costo dell&#039;estensione della vita utile<\/h3>\n<p>Molte centrali nucleari sono progettate per durare dai 40 ai 60 anni. Tuttavia, con opportuni ammodernamenti, la loro durata pu\u00f2 essere prolungata. Il costo di questi ammodernamenti varia da 500 milioni a 1,5 miliardi di euro, a seconda dell&#039;et\u00e0 e delle condizioni dell&#039;impianto.<\/p>\n<h3>Costi di smantellamento<\/h3>\n<p>La dismissione di una centrale nucleare \u00e8 un processo lungo e costoso. Il costo della dismissione varia da 101 a 151 tonnellate di petrolio greggio (TP3T) rispetto al costo di costruzione originale, ovvero da circa 500 milioni a 1,2 miliardi di euro per un impianto tipico da 1.000 MW.<\/p>\n<p>Il processo di smantellamento pu\u00f2 durare dai 15 ai 30 anni e comprende:<\/p>\n<ol>\n<li><strong>Rimozione del carburante<\/strong>: 1-2 anni<\/li>\n<li><strong>Smantellamento degli impianti non nucleari<\/strong>: 2-5 anni<\/li>\n<li><strong>Smantellamento del reattore<\/strong>: 5-10 anni<\/li>\n<li><strong>Decontaminazione e ripristino del sito<\/strong>: 5-10 anni<\/li>\n<\/ol>\n<h2>Confronto con altre fonti energetiche<\/h2>\n<p>Confrontando il costo totale di produzione di energia (inclusa la costruzione e la manutenzione), le centrali nucleari hanno:<\/p>\n<ul>\n<li><strong>Costi di costruzione iniziali pi\u00f9 elevati<\/strong> da centrali a gas naturale e a carbone<\/li>\n<li><strong>Costi operativi inferiori<\/strong> da impianti a combustibili fossili<\/li>\n<li><strong>Costo totale comparabile della produzione di energia<\/strong> con fonti di energia rinnovabili come l&#039;eolico e il solare<\/li>\n<\/ul>\n<p>Il costo medio di produzione per kilowattora (kWh) \u00e8:<\/p>\n<ul>\n<li><strong>Energia nucleare<\/strong>: 0,06-0,09 euro\/kWh<\/li>\n<li><strong>Gas naturale<\/strong>: 0,05-0,10 euro\/kWh<\/li>\n<li><strong>Carbonio<\/strong>: 0,07-0,12 euro\/kWh<\/li>\n<li><strong>Energia eolica<\/strong>: 0,04-0,08 euro\/kWh<\/li>\n<li><strong>Energia solare<\/strong>: 0,03-0,10 euro\/kWh<\/li>\n<\/ul>\n<h2>Casi di studio<\/h2>\n<h3>Flamanville 3 (Francia)<\/h3>\n<p>Il reattore Flamanville 3 in Francia \u00e8 un esempio lampante di superamento dei costi e dei tempi previsti. Inizialmente stimato in 3,3 miliardi di euro con data di completamento prevista per il 2012, il costo \u00e8 salito a oltre 12,7 miliardi di euro, con l&#039;avvio ripetutamente rinviato.<\/p>\n<h3>Hinkley Point C (Regno Unito)<\/h3>\n<p>La centrale di Hinkley Point C nel Regno Unito, con due reattori per una capacit\u00e0 totale di 3.200 MW, ha un costo di costruzione stimato di circa 25-30 miliardi di euro. L&#039;elevato costo \u00e8 in parte dovuto ai rigorosi requisiti di sicurezza e alla complessit\u00e0 del progetto.<\/p>\n<h3>Barakah (Emirati Arabi Uniti)<\/h3>\n<p>Al contrario, la centrale nucleare di Barakah negli Emirati Arabi Uniti, con quattro reattori dalla capacit\u00e0 complessiva di 5.600 MW, \u00e8 costata circa 20-25 miliardi di euro, presentando una costruzione pi\u00f9 economica grazie all&#039;esperienza dei costruttori sudcoreani e ai minori costi di manodopera.<\/p>\n<h2>Sfide economiche e prospettive future<\/h2>\n<h3>Rischi di finanziamento e di investimento<\/h3>\n<p>Il finanziamento delle centrali nucleari rappresenta una sfida significativa a causa degli elevati costi iniziali e dei lunghi periodi di ammortamento. I tassi di interesse per i progetti nucleari sono in genere superiori di 2-3 punti percentuali rispetto a quelli delle fonti di energia rinnovabile, a dimostrazione del maggiore rischio di investimento.<\/p>\n<h3>Sviluppi tecnologici e riduzione dei costi<\/h3>\n<p>Nuove tecnologie, come i piccoli reattori modulari (SMR), promettono di ridurre significativamente i costi di costruzione e manutenzione. Gli SMR hanno:<\/p>\n<ul>\n<li><strong>Costo iniziale inferiore<\/strong>: 1-3 miliardi di euro<\/li>\n<li><strong>Tempi di costruzione pi\u00f9 brevi<\/strong>: 3-5 anni contro 7-10 anni per i reattori convenzionali<\/li>\n<li><strong>Funzionalit\u00e0 di sicurezza migliorate<\/strong><\/li>\n<li><strong>Maggiore flessibilit\u00e0 nell&#039;installazione e nel funzionamento<\/strong><\/li>\n<\/ul>\n<h2>Conclusioni<\/h2>\n<p>La costruzione e la manutenzione di una centrale nucleare richiedono ingenti investimenti finanziari e una pianificazione a lungo termine. Gli elevati costi iniziali di costruzione sono in parte compensati dai costi operativi relativamente bassi e dalla lunga vita utile degli impianti.<\/p>\n<p>Tuttavia, le sfide economiche, tra cui sforamenti di costi e ritardi nella costruzione, hanno influito negativamente sulla competitivit\u00e0 dell&#039;energia nucleare rispetto ad altre fonti energetiche, in particolare quelle rinnovabili, i cui costi stanno diminuendo rapidamente.<\/p>\n<p>Le prospettive future dell&#039;energia nucleare dipenderanno in larga misura dal successo delle nuove tecnologie, come i piccoli reattori modulari, nel ridurre i costi e nell&#039;affrontare le sfide economiche che attendono il settore.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u0395\u03b9\u03c3\u03b1\u03b3\u03c9\u03b3\u03ae \u03a4\u03b1 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ac \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03b1 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03bf\u03cd\u03bd \u03bc\u03b9\u03b1 \u03c3\u03b7\u03bc\u03b1\u03bd\u03c4\u03b9\u03ba\u03ae \u03c0\u03b7\u03b3\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\u03c2 \u03c0\u03b1\u03b3\u03ba\u03bf\u03c3\u03bc\u03af\u03c9\u03c2, \u03c0\u03b1\u03c1\u03ac\u03b3\u03bf\u03bd\u03c4\u03b1\u03c2 \u03c0\u03b5\u03c1\u03af\u03c0\u03bf\u03c5 \u03c4\u03bf 10% \u03c4\u03b7\u03c2 \u03c0\u03b1\u03b3\u03ba\u03cc\u03c3\u03bc\u03b9\u03b1\u03c2 \u03b7\u03bb\u03b5\u03ba\u03c4\u03c1\u03b9\u03ba\u03ae\u03c2 \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\u03c2.<\/p>","protected":false},"author":1,"featured_media":71,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[22,23,18,20,21,12,19],"class_list":["post-70","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag--smr","tag-23","tag-18","tag-20","tag-21","tag-12","tag-19"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.9 (Yoast SEO v23.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>\u03a0\u03cc\u03c3\u03bf \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5 - \u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1<\/title>\n<meta name=\"description\" content=\"\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ce\u03bd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03c9\u03bd, \u03c3\u03c5\u03bc\u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03cc\u03bd\u03c4\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03bf\u03c5\u03bd \u03c4\u03b1 \u03ba\u03cc\u03c3\u03c4\u03b7, \u03bc\u03b5\u03bb\u03ad\u03c4\u03b5\u03c2 \u03c0\u03b5\u03c1\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03bc\u03b5\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03c1\u03bf\u03bf\u03c0\u03c4\u03b9\u03ba\u03ad\u03c2.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nuclearenergy.gr\/it\/quanto-costa-una-centrale-nucleare\/\" \/>\n<meta property=\"og:locale\" content=\"it_IT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u03a0\u03cc\u03c3\u03bf \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5\" \/>\n<meta property=\"og:description\" content=\"\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ce\u03bd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03c9\u03bd, \u03c3\u03c5\u03bc\u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03cc\u03bd\u03c4\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03bf\u03c5\u03bd \u03c4\u03b1 \u03ba\u03cc\u03c3\u03c4\u03b7, \u03bc\u03b5\u03bb\u03ad\u03c4\u03b5\u03c2 \u03c0\u03b5\u03c1\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03bc\u03b5\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03c1\u03bf\u03bf\u03c0\u03c4\u03b9\u03ba\u03ad\u03c2.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nuclearenergy.gr\/it\/quanto-costa-una-centrale-nucleare\/\" \/>\n<meta property=\"og:site_name\" content=\"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\" \/>\n<meta property=\"article:author\" content=\"\u039d\u03b1\u03c0\u03bf\u03bb\u03ad\u03c9\u03bd \u0396\u03ad\u03c1\u03b2\u03b1 05\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-13T12:40:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-13T12:46:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"853\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"NuclearEnergy\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scritto da\" \/>\n\t<meta name=\"twitter:data1\" content=\"NuclearEnergy\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo di lettura stimato\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minuti\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/\"},\"author\":{\"name\":\"NuclearEnergy\",\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/person\/ce18c9039df00f114dbaa6f1ac510d79\"},\"headline\":\"\u03a0\u03cc\u03c3\u03bf \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5\",\"datePublished\":\"2025-05-13T12:40:19+00:00\",\"dateModified\":\"2025-05-13T12:46:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/\"},\"wordCount\":65,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/nuclearenergy.gr\/#organization\"},\"image\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png\",\"keywords\":[\"\u03b1\u03bd\u03c4\u03b9\u03b4\u03c1\u03b1\u03c3\u03c4\u03ae\u03c1\u03b5\u03c2 SMR\",\"\u03b5\u03bd\u03b5\u03c1\u03b3\u03b5\u03b9\u03b1\u03ba\u03cc \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2\",\"\u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae\u03c2\",\"\u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae\u03c2 \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\u03c2\",\"\u03c0\u03b1\u03c1\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc\u03c2\",\"\u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf\",\"\u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b1\u03bd\u03c4\u03b9\u03b4\u03c1\u03b1\u03c3\u03c4\u03ae\u03c1\u03b1\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"it-IT\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/\",\"url\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/\",\"name\":\"\u03a0\u03cc\u03c3\u03bf \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5 - \u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"isPartOf\":{\"@id\":\"https:\/\/nuclearenergy.gr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png\",\"datePublished\":\"2025-05-13T12:40:19+00:00\",\"dateModified\":\"2025-05-13T12:46:16+00:00\",\"description\":\"\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ce\u03bd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03c9\u03bd, \u03c3\u03c5\u03bc\u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03cc\u03bd\u03c4\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03bf\u03c5\u03bd \u03c4\u03b1 \u03ba\u03cc\u03c3\u03c4\u03b7, \u03bc\u03b5\u03bb\u03ad\u03c4\u03b5\u03c2 \u03c0\u03b5\u03c1\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03bc\u03b5\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03c1\u03bf\u03bf\u03c0\u03c4\u03b9\u03ba\u03ad\u03c2.\",\"breadcrumb\":{\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#breadcrumb\"},\"inLanguage\":\"it-IT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#primaryimage\",\"url\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png\",\"contentUrl\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png\",\"width\":1280,\"height\":853,\"caption\":\"\u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae\",\"item\":\"https:\/\/nuclearenergy.gr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u03a0\u03cc\u03c3\u03bf \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nuclearenergy.gr\/#website\",\"url\":\"https:\/\/nuclearenergy.gr\/\",\"name\":\"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"description\":\"\u039c\u03b9\u03b1 \u03b9\u03c3\u03c4\u03bf\u03c3\u03b5\u03bb\u03af\u03b4\u03b1 \u03bc\u03b5 \u03c0\u03bb\u03b7\u03c1\u03bf\u03c6\u03bf\u03c1\u03af\u03b5\u03c2, \u03ac\u03c1\u03b8\u03c1\u03b1 \u03ba\u03b1\u03b9 \u03b3\u03c1\u03b1\u03c6\u03b9\u03ba\u03ad\u03c2 \u03b1\u03c0\u03b5\u03b9\u03ba\u03bf\u03bd\u03af\u03c3\u03b5\u03b9\u03c2 \u03c3\u03c7\u03b5\u03c4\u03b9\u03ba\u03ac \u03bc\u03b5 \u03c4\u03b7\u03bd \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"publisher\":{\"@id\":\"https:\/\/nuclearenergy.gr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nuclearenergy.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"it-IT\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/nuclearenergy.gr\/#organization\",\"name\":\"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\",\"url\":\"https:\/\/nuclearenergy.gr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/11\/cropped-cropped-nuclear-energy-icon.jpg\",\"contentUrl\":\"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/11\/cropped-cropped-nuclear-energy-icon.jpg\",\"width\":120,\"height\":120,\"caption\":\"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\"},\"image\":{\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/person\/ce18c9039df00f114dbaa6f1ac510d79\",\"name\":\"NuclearEnergy\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\/\/nuclearenergy.gr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/722301d4730f0933fcc556a50f7dfde0fcbbf9f39858949664d541ba7e186d48?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/722301d4730f0933fcc556a50f7dfde0fcbbf9f39858949664d541ba7e186d48?s=96&d=mm&r=g\",\"caption\":\"NuclearEnergy\"},\"sameAs\":[\"http:\/\/nuclearenergy.gr\",\"\u039d\u03b1\u03c0\u03bf\u03bb\u03ad\u03c9\u03bd \u0396\u03ad\u03c1\u03b2\u03b1 05\"],\"url\":\"https:\/\/nuclearenergy.gr\/it\/author\/tommykargmail-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Quanto costa costruire e mantenere una centrale nucleare - Energia nucleare","description":"Una presentazione dettagliata dei costi di costruzione e manutenzione delle centrali nucleari, compresi i fattori che incidono sui costi, casi di studio e prospettive future.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nuclearenergy.gr\/it\/quanto-costa-una-centrale-nucleare\/","og_locale":"it_IT","og_type":"article","og_title":"\u03a0\u03cc\u03c3\u03bf \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5","og_description":"\u0391\u03bd\u03b1\u03bb\u03c5\u03c4\u03b9\u03ba\u03ae \u03c0\u03b1\u03c1\u03bf\u03c5\u03c3\u03af\u03b1\u03c3\u03b7 \u03c4\u03bf\u03c5 \u03ba\u03cc\u03c3\u03c4\u03bf\u03c5\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae\u03c2 \u03ba\u03b1\u03b9 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ce\u03bd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03c9\u03bd, \u03c3\u03c5\u03bc\u03c0\u03b5\u03c1\u03b9\u03bb\u03b1\u03bc\u03b2\u03b1\u03bd\u03bf\u03bc\u03ad\u03bd\u03c9\u03bd \u03c4\u03c9\u03bd \u03c0\u03b1\u03c1\u03b1\u03b3\u03cc\u03bd\u03c4\u03c9\u03bd \u03c0\u03bf\u03c5 \u03b5\u03c0\u03b7\u03c1\u03b5\u03ac\u03b6\u03bf\u03c5\u03bd \u03c4\u03b1 \u03ba\u03cc\u03c3\u03c4\u03b7, \u03bc\u03b5\u03bb\u03ad\u03c4\u03b5\u03c2 \u03c0\u03b5\u03c1\u03b9\u03c0\u03c4\u03ce\u03c3\u03b5\u03c9\u03bd \u03ba\u03b1\u03b9 \u03bc\u03b5\u03bb\u03bb\u03bf\u03bd\u03c4\u03b9\u03ba\u03ad\u03c2 \u03c0\u03c1\u03bf\u03bf\u03c0\u03c4\u03b9\u03ba\u03ad\u03c2.","og_url":"https:\/\/nuclearenergy.gr\/it\/quanto-costa-una-centrale-nucleare\/","og_site_name":"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1","article_author":"\u039d\u03b1\u03c0\u03bf\u03bb\u03ad\u03c9\u03bd \u0396\u03ad\u03c1\u03b2\u03b1 05","article_published_time":"2025-05-13T12:40:19+00:00","article_modified_time":"2025-05-13T12:46:16+00:00","og_image":[{"width":1280,"height":853,"url":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png","type":"image\/png"}],"author":"NuclearEnergy","twitter_card":"summary_large_image","twitter_misc":{"Scritto da":"NuclearEnergy","Tempo di lettura stimato":"6 minuti"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#article","isPartOf":{"@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/"},"author":{"name":"NuclearEnergy","@id":"https:\/\/nuclearenergy.gr\/#\/schema\/person\/ce18c9039df00f114dbaa6f1ac510d79"},"headline":"\u03a0\u03cc\u03c3\u03bf \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5","datePublished":"2025-05-13T12:40:19+00:00","dateModified":"2025-05-13T12:46:16+00:00","mainEntityOfPage":{"@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/"},"wordCount":65,"commentCount":0,"publisher":{"@id":"https:\/\/nuclearenergy.gr\/#organization"},"image":{"@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#primaryimage"},"thumbnailUrl":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png","keywords":["\u03b1\u03bd\u03c4\u03b9\u03b4\u03c1\u03b1\u03c3\u03c4\u03ae\u03c1\u03b5\u03c2 SMR","\u03b5\u03bd\u03b5\u03c1\u03b3\u03b5\u03b9\u03b1\u03ba\u03cc \u03ba\u03cc\u03c3\u03c4\u03bf\u03c2","\u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae\u03c2","\u03bf\u03b9\u03ba\u03bf\u03bd\u03bf\u03bc\u03b9\u03ba\u03ac \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae\u03c2 \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1\u03c2","\u03c0\u03b1\u03c1\u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03cc\u03c2","\u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03cc \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03ac\u03c3\u03b9\u03bf","\u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b1\u03bd\u03c4\u03b9\u03b4\u03c1\u03b1\u03c3\u03c4\u03ae\u03c1\u03b1"],"articleSection":["Blog"],"inLanguage":"it-IT","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/","url":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/","name":"Quanto costa costruire e mantenere una centrale nucleare - Energia nucleare","isPartOf":{"@id":"https:\/\/nuclearenergy.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#primaryimage"},"image":{"@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#primaryimage"},"thumbnailUrl":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png","datePublished":"2025-05-13T12:40:19+00:00","dateModified":"2025-05-13T12:46:16+00:00","description":"Una presentazione dettagliata dei costi di costruzione e manutenzione delle centrali nucleari, compresi i fattori che incidono sui costi, casi di studio e prospettive future.","breadcrumb":{"@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#breadcrumb"},"inLanguage":"it-IT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/"]}]},{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#primaryimage","url":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png","contentUrl":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/05\/application-1756269_1280.png","width":1280,"height":853,"caption":"\u03ba\u03cc\u03c3\u03c4\u03bf\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5"},{"@type":"BreadcrumbList","@id":"https:\/\/nuclearenergy.gr\/%cf%80%cf%8c%cf%83%ce%bf-%ce%ba%ce%bf%cf%83%cf%84%ce%af%ce%b6%ce%b5%ce%b9-%cf%80%cf%85%cf%81%ce%b7%ce%bd%ce%b9%ce%ba%cf%8c-%ce%b5%cf%81%ce%b3%ce%bf%cf%83%cf%84%ce%ac%cf%83%ce%b9%ce%bf\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae","item":"https:\/\/nuclearenergy.gr\/"},{"@type":"ListItem","position":2,"name":"\u03a0\u03cc\u03c3\u03bf \u03ba\u03bf\u03c3\u03c4\u03af\u03b6\u03b5\u03b9 \u03b7 \u03ba\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03ae \u03ba\u03b1\u03b9 \u03b7 \u03c3\u03c5\u03bd\u03c4\u03ae\u03c1\u03b7\u03c3\u03b7 \u03b5\u03bd\u03cc\u03c2 \u03c0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03bf\u03cd \u03b5\u03c1\u03b3\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03bf\u03c5"}]},{"@type":"WebSite","@id":"https:\/\/nuclearenergy.gr\/#website","url":"https:\/\/nuclearenergy.gr\/","name":"Energia nucleare","description":"Un sito web con informazioni, articoli e grafici sull&#039;energia nucleare","publisher":{"@id":"https:\/\/nuclearenergy.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nuclearenergy.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"it-IT"},{"@type":"Organization","@id":"https:\/\/nuclearenergy.gr\/#organization","name":"Energia nucleare","url":"https:\/\/nuclearenergy.gr\/","logo":{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/nuclearenergy.gr\/#\/schema\/logo\/image\/","url":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/11\/cropped-cropped-nuclear-energy-icon.jpg","contentUrl":"https:\/\/nuclearenergy.gr\/wp-content\/uploads\/2025\/11\/cropped-cropped-nuclear-energy-icon.jpg","width":120,"height":120,"caption":"\u03a0\u03c5\u03c1\u03b7\u03bd\u03b9\u03ba\u03ae \u03b5\u03bd\u03ad\u03c1\u03b3\u03b5\u03b9\u03b1"},"image":{"@id":"https:\/\/nuclearenergy.gr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/nuclearenergy.gr\/#\/schema\/person\/ce18c9039df00f114dbaa6f1ac510d79","name":"Energia nucleare","image":{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/nuclearenergy.gr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/722301d4730f0933fcc556a50f7dfde0fcbbf9f39858949664d541ba7e186d48?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/722301d4730f0933fcc556a50f7dfde0fcbbf9f39858949664d541ba7e186d48?s=96&d=mm&r=g","caption":"NuclearEnergy"},"sameAs":["http:\/\/nuclearenergy.gr","\u039d\u03b1\u03c0\u03bf\u03bb\u03ad\u03c9\u03bd \u0396\u03ad\u03c1\u03b2\u03b1 05"],"url":"https:\/\/nuclearenergy.gr\/it\/author\/tommykargmail-com\/"}]}},"_links":{"self":[{"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/posts\/70","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/comments?post=70"}],"version-history":[{"count":2,"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/posts\/70\/revisions"}],"predecessor-version":[{"id":73,"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/posts\/70\/revisions\/73"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/media\/71"}],"wp:attachment":[{"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/media?parent=70"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/categories?post=70"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearenergy.gr\/it\/wp-json\/wp\/v2\/tags?post=70"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}